Dholera EV Charging Infrastructure Guidelines: DICDL Station Mandates

To support green mobility and transition to clean transportation, the Dholera Special Investment Region Development Authority (DSIRDA) and DICDL have integrated electric vehicle (EV) infrastructure standards into the building approval process. Under Section 12.14 of the DSIRDA GDCR, all new residential townships, commercial towers, and industrial parks must reserve dedicated parking spaces equipped with EV charging points. These standards ensure the city’s power grid, managed by Torrent Power, can accommodate widespread EV adoption.


1. Mandatory EV Parking Allocation Percentages

Developers must allocate a specific percentage of their required parking bays for EV charging based on the property type:

  • Residential Townships & Apartment Buildings: At least 20% of total mandatory parking bays must be EV-ready. These bays must feature dedicated 230V AC charging points (minimum 3.3kW to 7.4kW) or pre-installed conduits connected to individual apartment power sub-meters.
  • Commercial Plazas & Office Complexes: At least 10% to 15% of parking bays must be equipped with public EV chargers. This must include at least two dedicated DC Fast Charging stations (50kW to 150kW) for visitors and fleet vehicles.
  • Industrial Plants & Logistics Hubs: At least 5% of heavy vehicle parking bays must feature high-output charging infrastructure to support electric cargo trucks, forklifts, and logistics vans.
  • Public Parking Lots: Central multi-level car parks built by DICDL allocate 25% of bays for EV charging, integrated with solar canopy roofing.

2. Electrical Conduit and Substation Load Sizing

To prevent costly retrofits, electrical infrastructure must be embedded during initial building construction:

  • Dedicated Conduit Routing: Underground parking slabs must feature pre-installed PVC/fire-retardant conduits running from the main electrical meter room to every EV-designated parking bay.
  • Substation Load Capacity Calculation: When applying for power sanctions from Torrent Power, developers must include the EV charging load in their connected load calculations:
  • Residential Level 2 AC Bays: Calculated at 3.3kW to 7.4kW per bay.
  • Commercial DC Fast Chargers: Calculated at 50kW to 150kW per charger.
  • Smart Energy Management: Commercial high-rises must use dynamic load-balancing software to modulate charging speeds during peak electrical demand hours, preventing transformer overloads.

The table below outlines EV infrastructure requirements under DSIRDA GDCR:

Development CategoryMin. EV-Ready Parking %Charger Specification RequiredSubstation Power Load Allocation
**Residential Apartments**20% of total baysLevel 2 AC (3.3kW – 7.4kW)3.3kW per EV bay
**Commercial Towers & Malls**15% of total baysAC Dual-gun & DC Fast (50kW+)50kW – 150kW dedicated load
**Industrial / Logistics Parks**5% of truck baysDC High-Capacity (100kW – 240kW)100kW per heavy vehicle bay
**Institutional / Hospitals**10% of total baysLevel 2 AC + 1 DC Fast Charger50kW dedicated load

3. Safety, Fire Separation, and Signage

  • Fire Separation Buffers: Basement EV charging bays must be located within 15 meters of a fire exit stairwell or ramp, and must be covered by automatic fire sprinkler systems and smoke extraction ducts.
  • Standardized Signage: Every EV charging bay must have green floor markings and standard reflective signage displaying the charging capacity and access rules.
  • Weather Protection: Surface-level EV stations must be sheltered with canopy roofing to shield electrical connectors and charging pedestals from monsoon rains and high ambient summer temperatures.

Frequently Asked Questions (FAQ)

#### What percentage of parking spaces must be EV-ready in residential projects in Dholera?

Under DSIRDA GDCR Section 12.14, at least 20% of all provided vehicular parking bays in residential developments must be equipped with EV charging conduits and power connections.

#### Who supplies the electrical power for EV charging stations in Dholera SIR?

Torrent Power provides the underlying electrical grid infrastructure, delivering 24/7 power to private and public EV charging stations.

#### Are commercial buildings required to install DC fast chargers in Dholera?

Yes. Commercial towers and retail plazas must provide at least two dedicated DC Fast Charging bays (50kW+) for visitor and fleet use.