The DICDL Allotment Process
Unlike residential plotting schemes, purchasing industrial land in Dholera Special Investment Region (DSIR) involves a formal application process through DICDL’s single-window clearance portal at the ABCD building:
- Application Submission: Manufacturers submit detailed project reports (DPR), detailing water usage, power requirements, effluent discharge parameters, and employment generation forecasts.
- Scrutiny and Land Allocation: DICDL evaluates the application’s compatibility with neighbor industries. Plots are grouped by environmental impact class (Green, Orange, Red categories).
- Allotment Letter & Agreement: On approval, DICDL issues the allotment letter, and the manufacturer enters into a long-term lease agreement.
Utility Grid Infrastructure & Power Slabs
Manufacturing setups require massive, uninterrupted utilities. Dholera SIR is built to provide uninterrupted grid utility access:
- Uninterrupted Smart Power Grid: Torrent Power manages a 400kV/220kV/66kV grid system, providing direct sub-station interfaces with dual-redundant lines to prevent production downtime.
- Tariff Incentives: Under the Gujarat State Electronics Policy, semiconductor fabs and EMS units qualify for subsidized power tariffs and green solar offsets.
- Recycled Industrial Water: DICDL provides tertiary-treated municipal wastewater directly to industrial zones, conserving pure potable groundwater for residential zones.
Industrial Zoning & Utility Specifications
This matrix outlines the specifications for industrial layouts inside the master plan:
| Industrial Zone Class | Allowed FSI | ROW (Access Road) | Target Manufacturing Cluster | Key Utility Interface |
|---|---|---|---|---|
| Electronics & EMS (Green) | 1.8 | 30 to 45 meters | Semiconductor fabs, cleanroom packaging | Sub-station backup lines |
| General Engineering (Orange) | 1.6 | 45 to 55 meters | Automotive parts, precision tools | Recycled water pipeline |
| Heavy Manufacturing (Red) | 1.2 | 55+ meters | Heavy steel, chemicals, EV battery parks | Direct gas line, effluent outfall |
Key Takeaways for Industrial Buyers
- Check Environmental Categories: Verify that your manufacturing class matches the zone’s environmental category. Heavy chemical plants cannot buy land in green electronics zones.
- FSI Limits are Fixed: Industrial zones are strictly capped at an FSI of 1.2 to 1.8 under Table 10-6 depending on road width. Proximity to wider roads allows higher build-up density.
- Single-Window Clearances: Take advantage of the DICDL single-window clearance portal located in the ABCD building. Building plan sanctions are issued digitally within 30 days of submission.
Frequently Asked Questions (FAQ)
Who distributes power in the Dholera industrial zones?
Torrent Power is the sole authorized power distribution licensee for Dholera SIR, operating a highly automated smart grid with substation linkages to guarantee stable power for manufacturers.
Can private buyers purchase industrial plots inside TP5?
Yes, private entities and industrial developers can purchase industrial plots for manufacturing or warehouse developments, provided they comply with DICDL application reviews and zoning restrictions.