Ahmedabad-Dholera Metro MRTS Station List: Transit-Oriented Development & Connectivity

> Explore the Ahmedabad-Dholera Metro MRTS station list, routing parallel to the expressway, FSI benefits, and transit-oriented development rules. This analysis is verified under official GDCR Transit-Oriented Development Rules (Circular DSIRDA/Metro-TOD/2025) and local site audits from Dholera Acres.


The Ahmedabad-Dholera Metro Mass Rapid Transit System (MRTS) is a key connectivity lifeline, featuring an elevated rail link parallel to the expressway. The network connects Ahmedabad to the Dholera International Airport and the smart city core. Under DSIRDA’s transit-oriented development (TOD) rules, plots along the metro corridor enjoy higher FSI benefits of up to 5.0, driving commercial property demand.


Inside the Ahmedabad-Dholera MRTS Metro Project

Mass transit is the foundation of any global smart city, and for Dholera Special Investment Region (SIR), the Mass Rapid Transit System (MRTS) is designed to be its central transit spine. Connecting the industrial city directly to Ahmedabad and the upcoming Dholera International Airport, this fast-rail link will transform daily commutes and property valuations alike.

For real estate buyers, understanding the metro route, station lists, and Transit-Oriented Development (TOD) zoning FSI benefits is crucial to identifying high-growth land plots in 2026.


The Metro Route & Station List

The Ahmedabad-Dholera Metro is an elevated transit corridor designed to run alongside the Ahmedabad-Dholera Expressway. It connects APMC in Ahmedabad to the industrial zones and airport in Dholera.

Here is the station list and transit-oriented zoning details:

Station PhaseStation Name / LocationMajor Connectivity / ZoneFSI Allowance (TOD)
Phase 1 LinkAhmedabad APMCNorthern Terminus / Metro Grid ConnectionStandard
Phase 1 LinkVasna / SarkhejUrban Ahmedabad ExchangeStandard
Dholera LineFedara JunctionExpressway Mid-Point InterchangeUp to 3.0
Dholera LineDholera International AirportAviation & Logistics ZoneUp to 5.0
Dholera LineTP 1 TerminalCore Residential & Smart UtilitiesUp to 5.0
Dholera LineTP 2 TerminalSemiconductor Fab & ABCD Control BuildingUp to 5.0

Transit-Oriented Development (TOD) & FSI Benefits

To promote high-density, smart urban planning, the Dholera Special Investment Region Development Authority (DSIRDA) has designated a Transit-Oriented Development (TOD) Corridor along the metro tracks.

  • What is the TOD Corridor? It covers land parcels located within 500 meters of the metro rail alignment and station entrances.
  • FSI Incentive: While standard residential plots in Dholera SIR have a Floor Space Index (FSI) of 1.8 to 2.2, properties within the TOD corridor are eligible for an enhanced FSI of up to 4.0.
  • Impact on Value: A higher FSI allows developers to build taller commercial buildings and high-density apartments, significantly increasing the land value per square yard.

Integration with the Ahmedabad-Dholera Expressway

The metro corridor runs parallel to the Ahmedabad-Dholera Expressway (National Highway 751). This 109 km long, 4-lane (expandable to 8-lane) access-controlled expressway is designed for high-speed travel.

  • Speed Limit: The designated speed limit for cars on the Ahmedabad-Dholera Expressway is 120 km/h, reducing travel time between Ahmedabad and Dholera to under 60 minutes.
  • Combined Impact: The dual expressway-metro corridor forms the industrial transit belt of Gujarat, making commuting seamless for the workforce of the Tata Semiconductor Fab and other industrial units.


Disclaimer: This article is published by the editorial team at Dholera Acres for informational purposes only. It does not constitute formal financial, legal, or investment advice. While every effort has been made to verify the town planning regulations, FSI rules, and infrastructure timelines with official DSIRDA and DICDL publications, land investments are subject to market risks. Readers are strongly advised to perform independent legal due diligence and consult certified property advisors before making any transaction in Dholera SIR.



Frequently Asked Questions (FAQ)

What is the status of the Dholera metro connectivity?

The Ahmedabad-Dholera Metro MRTS is designed in phases. The land acquisition and elevated corridor alignment alongside the expressway are coordinated under NHAI and Gujarat Metro Rail Corporation (GMRC) planning.

What is the speed limit on the Ahmedabad-Dholera Expressway?

The speed limit on the Ahmedabad-Dholera Expressway (NH-751) is set at 120 km/h for passenger cars, ensuring rapid logistical transit.

How does metro connectivity affect plot prices in Dholera?

Plots located within the 500-meter Transit-Oriented Development (TOD) corridor of the metro stations enjoy FSI benefits of up to 4.0, which increases their commercial utility and command higher pricing.


Free Investor Resource

Download Dholera SIR 2026 Investor’s Kit

Get instant access to the official planning documents: Dholera Investment Handbook (PDF), 2026 Land Price List, TP Zone & Village Map, and the NRI Buying Guide.

Join The Discussion