> Dholera is set to become the world’s largest data center city, according to a recent announcement by Gujarat Deputy CM Harsh Sanghavi. The cluster is designed to host over 7.5GW of hyperscale capacity, establishing Dholera as India’s premier hub for AI, cloud computing, and Global Capability Centers (GCCs).
Comparing Global & National Digital Infrastructure Scales
The massive 7.5GW target capacity planned for Dholera represents a monumental jump in India’s digital capacity:
- India’s Current Footprint: India currently operates around 200 data centers with a total capacity of approximately 2GW.
- Dholera’s Projected Cluster: At 7.5GW, the Dholera cluster alone will more than triple India’s current capacity, positioning it alongside major global hubs.
- Global Benchmarks: The expansion is designed to bridge the gap with developed digital economies like the United States (hosting ~5,500 data centers) and the United Kingdom (hosting ~500 data centers).
| Region | Total Data Centers (Active) | Total Capacity | Infrastructure Focus |
|---|---|---|---|
| India (National Total) | ~200 | ~2.0 GW | Cloud storage, regional backups |
| Dholera SIR (Target) | Cluster Zone | 7.5+ GW | AI models, Cloud, Quantum computing |
| United Kingdom | ~500 | ~3.0 GW | Multi-tenant colocation, finance |
| United States | ~5,500 | ~15.0 GW | Hyperscale clusters, AI fabrics |
Key Infrastructure Backbones Enabling the Data Center City
A data center cluster of this scale requires extremely reliable power grids, digital Command centers, and transport linkages:
- Torrent Power Smart Grid: Data centers require stable, uninterrupted power. Torrent Power is deploying dedicated substations inside the SIR to guarantee reliable power.
- Global Capability Centers (GCCs): The city is being integrated with high-density commercial zones to house corporate engineering and operations hubs.
- Transit Infrastructure: The cluster is supported by the upcoming Dholera International Airport and the semi-high-speed rail link connecting Dholera to Ahmedabad. Browse our verified listings in Mahadevpura-HAC (ID 2719) and Navagam-Airport (ID 2703).

Frequently Asked Questions (FAQ)
Why is Dholera preferred for large-scale data center investments?
Dholera offers large, contiguous land parcels with pre-routed utility ducts, cheap green energy sources, and dedicated power grids, reducing setup times for hyperscale operators.
Is GujRERA compulsory for data center land plotting in Dholera?
RERA registration is not compulsory for purely land-plotting layouts in Dholera SIR. It is only mandatory for projects with active builder construction commitments. For plotting layouts, verify layout approvals from DSIRDA.
Which governmental agency handles approvals for data center projects?
Science and Technology Department of Gujarat, in coordination with DSIRDA and DICDL, provides single-window clearance, assigning senior nodal officers to facilitate all approvals.
Disclaimer: Project capacities, policy targets, and development timelines are subject to adjustments by the Government of Gujarat and DSIRDA. Investors must conduct personal due diligence prior to buying.
Download Dholera SIR 2026 Investor’s Kit
Get instant access to the official planning documents: Dholera Investment Handbook (PDF), 2026 Land Price List, TP Zone & Village Map, and the NRI Buying Guide.

Join The Discussion