Dholera Set to Be World’s Largest Data Centre City: 7.5GW Cluster

> Dholera is set to become the world’s largest data center city, according to a recent announcement by Gujarat Deputy CM Harsh Sanghavi. The cluster is designed to host over 7.5GW of hyperscale capacity, establishing Dholera as India’s premier hub for AI, cloud computing, and Global Capability Centers (GCCs).


The Gujarat government has officially launched plans to establish dholera smart city development as the primary hub for hyperscale digital infrastructure in India. Driven by rising global demands for AI training models and cloud hosting, the state has formulated a dedicated data center policy. Highlighting the scale of the initiatives, Deputy CM Harsh Sanghavi announced that investor interest has already exceeded the initial policy target capacity of 7.5GW. For land buyers, this mega-infrastructure commitment serves as a massive valuation driver for the entire region. At Dholera Acres, we deal exclusively in 100% verified, NA NOC title-clear land parcels located within active, high-growth investment zones.


Comparing Global & National Digital Infrastructure Scales

The massive 7.5GW target capacity planned for Dholera represents a monumental jump in India’s digital capacity:

  • India’s Current Footprint: India currently operates around 200 data centers with a total capacity of approximately 2GW.
  • Dholera’s Projected Cluster: At 7.5GW, the Dholera cluster alone will more than triple India’s current capacity, positioning it alongside major global hubs.
  • Global Benchmarks: The expansion is designed to bridge the gap with developed digital economies like the United States (hosting ~5,500 data centers) and the United Kingdom (hosting ~500 data centers).
RegionTotal Data Centers (Active)Total CapacityInfrastructure Focus
India (National Total)~200~2.0 GWCloud storage, regional backups
Dholera SIR (Target)Cluster Zone7.5+ GWAI models, Cloud, Quantum computing
United Kingdom~500~3.0 GWMulti-tenant colocation, finance
United States~5,500~15.0 GWHyperscale clusters, AI fabrics

Key Infrastructure Backbones Enabling the Data Center City

A data center cluster of this scale requires extremely reliable power grids, digital Command centers, and transport linkages:

  1. Torrent Power Smart Grid: Data centers require stable, uninterrupted power. Torrent Power is deploying dedicated substations inside the SIR to guarantee reliable power.
  2. Global Capability Centers (GCCs): The city is being integrated with high-density commercial zones to house corporate engineering and operations hubs.
  3. Transit Infrastructure: The cluster is supported by the upcoming Dholera International Airport and the semi-high-speed rail link connecting Dholera to Ahmedabad. Browse our verified listings in Mahadevpura-HAC (ID 2719) and Navagam-Airport (ID 2703).
Trunk digital and ICT infrastructure in Dholera Smart City

Frequently Asked Questions (FAQ)

Why is Dholera preferred for large-scale data center investments?

Dholera offers large, contiguous land parcels with pre-routed utility ducts, cheap green energy sources, and dedicated power grids, reducing setup times for hyperscale operators.

Is GujRERA compulsory for data center land plotting in Dholera?

RERA registration is not compulsory for purely land-plotting layouts in Dholera SIR. It is only mandatory for projects with active builder construction commitments. For plotting layouts, verify layout approvals from DSIRDA.

Which governmental agency handles approvals for data center projects?

Science and Technology Department of Gujarat, in coordination with DSIRDA and DICDL, provides single-window clearance, assigning senior nodal officers to facilitate all approvals.


Disclaimer: Project capacities, policy targets, and development timelines are subject to adjustments by the Government of Gujarat and DSIRDA. Investors must conduct personal due diligence prior to buying.

Free Investor Resource

Download Dholera SIR 2026 Investor’s Kit

Get instant access to the official planning documents: Dholera Investment Handbook (PDF), 2026 Land Price List, TP Zone & Village Map, and the NRI Buying Guide.

Join The Discussion